Client: Special Metals

Date: 2015

To construct reinforced concrete walls, suspended slabs and foundations, at a series of different heights and shapes, with associated holding down bolt assemblies for new machine foundation.

Volume of excavation works 1500m3, varying depth of excavation from 1-20m to 6m deep. Volume of concrete poured, 540m3.

Factory 

Production

Works carried out in a confined area to enable to allow factory production to continue in adjacent areas.

We care about 
your opinion.

I’ve used Owen Pell on several residential projects, they are professional, great value and deliver on time. Highly Recommended…

Chris Willis

Blandit ullamcorper a pharetra egestas leo sit eu. Sapien aliquam sit at magna morbi nulla nulla sed nunc. Odio vel ullamcorper amet eu non justo.

Jane Doe

Blandit ullamcorper a pharetra egestas leo sit eu. Sapien aliquam sit at magna morbi nulla nulla sed nunc. Odio vel ullamcorper amet eu non justo.

Jane Doe

Blandit ullamcorper a pharetra egestas leo sit eu. Sapien aliquam sit at magna morbi nulla nulla sed nunc. Odio vel ullamcorper amet eu non justo.

Jane Doe