Client: Special Metals
Date: 2015
To construct reinforced concrete walls, suspended slabs and foundations, at a series of different heights and shapes, with associated holding down bolt assemblies for new machine foundation.
Volume of excavation works 1500m3, varying depth of excavation from 1-20m to 6m deep. Volume of concrete poured, 540m3.
Factory
Production
Works carried out in a confined area to enable to allow factory production to continue in adjacent areas.